Client: Ministry of Public Works and Housing
Project Description:
Irbid Ring Road which is approximately 54 Km in the total length,
begins at about one kilometer before it intersects with Irbid – Amman Road.
Beyond the intersection, the road extends in a northern direction oriented east
of the Refugee Camp (Azmi Al Mufti Camp) and east of As Sarih and crosses Irbid
– Huwwara Road. Then it takes a northern western direction crossing three more
radial roads (Bushra – Ramtha, Irbid – Mughayyir Road and Marwu Road). The road
is located north of Marru until it connects with Irbid – Bayt Ras Road at the
intersection of the road to Um Qais (Al Maqarin Intersection)
There are (10) Interchanges proposed on Irbid Ring Road, namely:
Amman Interchange
Huwwara Interchange
Ramtha Interchange
Maqarin Interchange
Um Al Jadayil Interchange
North Shuneh Interchange
Inner Ring Road Interchange
Ajlun Interchange
Aydun Interchange
Al Husun Interchange
There are (7) under passes crossing Irbid Ring Road, namely:
Crossing with Al’aal Road
(1)
Crossing with Al’aal Road (2)
Crossing with Zahar, Jijjin and Doqara RoadCrossing with Old
Shuneh Road.
Crossing with Quarry Road
Crossing with Shatana Road
Extension of existing underpass on the existing North Shuneh –
Irbid Road to underpass Ramp D on North Shuneh Interchange
There are 2 major intersections linking Irbid Ring Road, namely:
Crossing with Irbid – Mghayyir Road
Crossing with a village road at.
The Project was divided into 2 stages for construction
Stage1:
Phase 1: includes the main road with a length of 9 km and four
lanes separated by a median, it contains service roads with a length of 6 km
and 2 intersections.
the project consists of the construction of 6 tunnels and 3
bridges, including the Wadi Al-Ghafar Valley Bridge, with a height of 72 meters
and a length of 310 meters, and it is considered one of the highest bridges in
Jordan and the region (completed)
Phase 2: includes the main road with a length of 9 km and four
lanes separated by a median, it contains
service roads with a length of 7.5 km , 2 intersections. and the
construction of 2 tunnels . (completed)
Phase 3: includes the main road with a length of 5.6 km and four
lanes separated by a median, it contains service roads with a length of 4 km, 1
intersection. and the construction of 1 tunnel .
Phase 4: includes the main road with a length of 5.8 km and four
lanes separated by a median, it contains service roads with a length of 5 km
and 1 intersection
Stage2:
The main road with 19 Km length and four lanes separated by a
median, 4 main intersections , 2 tunnels 2 km service road.
Services:
Reconnaissance, Preliminary and Final Design, Environmental
Assessment, , Traffic Study and Pavement Design, Economic Feasibility and Tender
Documents .